Tower Inspection Procedures Flashcards
6 cards from real PASMA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Tower Inspection Procedures flashcards as text
What should an inspector check regarding the proximity of the tower to open edges or excavations?
Answer: That the tower is positioned a safe distance from unprotected edges, excavations, or holes and that the ground is not undermined
Towers near edges or excavations are at risk of collapse if the ground fails or if the tower is accidentally pushed over the edge. The inspector must verify safe positioning, adequate edge protection, and that excavations have not undermined the ground beneath the tower.
What documentation should be available on site during a tower scaffold inspection?
Answer: The manufacturer's instruction manual, previous inspection reports, risk assessment, and method statement
The inspector needs access to the manufacturer's instruction manual (to verify correct assembly), previous inspection reports (to check recurring issues), and the risk assessment and method statement (to verify controls are in place).
How should non-conformances found during inspection be categorised?
Answer: They should be rated by severity — critical defects require immediate action, minor defects require planned rectification
Non-conformances should be categorised by severity. Critical defects (missing guard rails, cracked frames, failed brakes) require the tower to be immediately taken out of service. Minor defects (surface corrosion, minor dents) require planned rectification within a defined timeframe.
What should be checked about the area surrounding the base of the tower during an inspection?
Answer: That the area is clear of debris, the exclusion zone is maintained, and warning signs are displayed
The base area must be clear of trip hazards, the exclusion zone (to protect against falling objects) must be maintained and signed, and access routes must be unobstructed. Stored materials should not obstruct the stabilisers or base.
At what point during the assembly process should inspections begin?
Answer: At each stage of assembly to verify correct construction before proceeding to the next level
Good practice requires checks at each stage of assembly — verifying each lift is correctly assembled, braced, and locked before building the next level. This prevents errors from being built upon and avoids costly dismantling to correct mistakes.
What specific inspection is required after a tower scaffold has been moved to a new location?
Answer: A full pre-use inspection including base conditions, levelness, castor locks, and overall stability at the new position
Moving a tower to a new location changes the ground conditions, proximity to hazards, and wind exposure. A full pre-use inspection must verify the new base is adequate, the tower is level and plumb, all brakes are applied, and the tower is stable in its new environment.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- pasma.co.uk — Eligibility, exam dates, passing score, time limit, score validity, test delivery, fees, renewal, retake policy · verified Oct 2026