  1. What is the correct sequence for dismantling a mobile tower scaffold?

    Answer: Top down, reversing the assembly procedure

    Towers must always be dismantled from the top down, reversing the assembly sequence. This maintains structural integrity throughout the process and ensures operatives are always working from a stable platform.

  2. What is the purpose of horizontal braces (ledgers) in a tower scaffold?

    Answer: To provide lateral stability and maintain frame spacing

    Horizontal braces connect the two frames together, maintaining the correct spacing and providing lateral stability. Without them, the tower would be prone to racking and collapse.

  3. What is the function of diagonal braces on a tower scaffold?

    Answer: They prevent racking (lateral sway) of the tower

    Diagonal braces prevent racking, which is the tendency of the tower to sway or lean sideways. They triangulate the structure, converting it from a potentially unstable parallelogram into rigid triangles.

  4. When assembling a tower, at what height must a platform with edge protection first be provided?

    Answer: At any height where there is a risk of a fall

    Under the Work at Height Regulations 2005, there is no minimum height threshold — platforms and edge protection must be provided at any height where a person could fall and injure themselves. Even falls from low heights can cause serious injury.

  5. What type of locking mechanism is typically used to secure frames together during assembly?

    Answer: Spring-loaded gravity locks or wind locks

    Modern tower scaffolds use spring-loaded gravity locks (also called wind locks or spigot clips) that automatically engage when frames are connected. These must be checked to ensure they have fully locked into position.

  6. What should be done if a component is found to be damaged during assembly?

    Answer: Remove it from use, label it as defective, and replace with a sound component

    Damaged components must be immediately removed from use and clearly marked or tagged as defective to prevent them being used again. Only sound components that meet the manufacturer's specification should be used in the tower.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. pasma.co.uk — Eligibility, exam dates, passing score, time limit, score validity, test delivery, fees, renewal, retake policy · verified Oct 2026