Under OSHA 1926.1419, when is a signal person required on a crane operation?
-
A
When the operator cannot see the load or path of travel clearly throughout the entire lift, or when working near power lines
-
B
Whenever more than two workers are present on the jobsite
-
C
Only when the load exceeds 75% of rated capacity
-
D
When the crane boom exceeds 100 feet in length