NCCCO (National Commission for the Certification of Crane Operators) Practice Test

โ–ถ

NCCCO Hazard Identification and Power Line Safety 2

Free ยท Instant Results

Under OSHA 29 CFR 1926 Subpart CC, what is the minimum required clearance distance between a crane and an energized power line of unknown voltage?
โ–ถ Start Practice Test