A master plumber is installing a natural gas piping system with a proposed maximum working pressure of 0.5 psi. According to the IFGC, what is the minimum required test pressure and duration for this new piping system before any appliance is connected?
-
A
1.5 psi for 10 minutes
-
B
3.0 psi for 10 minutes
-
C
5.0 psi for 15 minutes
-
D
1.0 psi for 30 minutes