Practice Test Geeks home

Master Plumber Exam FREE Master Plumber Jobsite Safety and Regulations Questions and Answers

A master plumber is supervising a crew excavating a 7-foot deep trench in what has been identified as Type C soil.
The trench walls are vertical (unsloped).

According to OSHA standards (29 CFR 1926 Subpart P), what is the minimum requirement before a worker can enter this trench?

Select your answer