An inspector performing Liquid Penetrant Testing (PT) on a non-porous component correctly completes the pre-cleaning, penetrant application, and dwell time steps. What is the immediate next step required to ensure an accurate inspection?
-
A
Apply a thick layer of developer to the surface.
-
B
Remove the excess penetrant from the surface.
-
C
Inspect the component under high-intensity white light.
-
D
Heat the component to accelerate developer action.