A manufacturing plant calculates its Overall Equipment Effectiveness (OEE) and finds the score to be consistently below world-class standards (which is typically 85%). The data shows Availability is 90%, Performance is 95%, but Quality is only 75%. Which of the following initiatives should the reliability team prioritize to improve the plant's process reliability?
-
A
Implementing a more rigorous preventive maintenance schedule to reduce downtime.
-
B
Analyzing slow cycles and minor stops to increase machine speed.
-
C
Conducting Root Cause Analysis (RCA) on product defects and scrap.
-
D
Investing in new equipment with a higher ideal cycle time.