What is the primary purpose of flowing a small amount of dry nitrogen through the copper tubing while brazing a line set during an AC installation?
-
A
To cool the joint rapidly for a stronger bond
-
B
To prevent the formation of copper oxide scale inside the tubing
-
C
To increase the internal pressure, forcing the brazing alloy into the joint
-
D
To purge any residual refrigerant from the new line set