Commissioning and Servicing Flashcards
6 cards from real OFTEC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Commissioning and Servicing flashcards as text
What is the first step when commissioning a newly installed oil-fired boiler?
Answer: Check the installation complies with manufacturer instructions and Building Regulations
Before operating the appliance, the technician must verify the complete installation complies with manufacturer specifications, Building Regulations, and OFTEC Technical Standards. This includes checking flue, oil supply, ventilation, and electrical connections.
What document must be completed and left with the customer after commissioning an oil-fired appliance?
Answer: A commissioning checklist/certificate and Building Regulations compliance notification
A commissioning checklist recording all test results must be completed and a copy left with the customer. For OFTEC registered work, Building Regulations notification must also be submitted. This provides a permanent record of the installation.
Why must the heating system be flushed and filled before firing the boiler for the first time?
Answer: To remove installation debris and ensure water circulation before applying heat
The heating system must be flushed to remove flux residue, solder debris, and manufacturing contaminants that could damage the boiler and pump. Filling and venting ensures proper water circulation before heat is applied, preventing localised boiling.
What safety device must be tested during the commissioning of an oil-fired boiler?
Answer: The overheat thermostat (limit stat) must be tested to confirm it shuts down the burner
The overheat thermostat (high-limit or limit stat) is a critical safety device that shuts down the burner if the boiler water temperature exceeds a safe limit (typically 90-100°C). It must be tested to ensure it operates correctly.
What must be checked regarding the electrical supply to the oil burner during commissioning?
Answer: Correct polarity, earthing, and that the supply is protected by an appropriate fuse or MCB
Correct electrical polarity (live, neutral, earth) must be verified as many burner control boxes are polarity-sensitive. The earth must be sound, and the circuit must be protected by an appropriate fuse or MCB (typically 3A or 5A).
After completing combustion adjustments during commissioning, what should be recorded?
Answer: All flue gas readings: CO2, CO, O2, flue temperature, smoke number, and calculated efficiency
All combustion parameters must be recorded on the commissioning certificate: CO2%, CO (ppm), O2%, flue gas temperature, room temperature, net flue gas temperature, smoke number, calculated efficiency, and pump pressure. These form the benchmark for future servicing.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- bpec.org.uk — Retake policy · verified Oct 2026
- oftec.org — Fees, renewal, eligibility, exam format, score validity, test delivery · verified Oct 2026