  1. What PPE should an OFTEC technician wear when servicing an oil burner?

    Answer: Safety glasses, protective gloves, and dust mask when cleaning soot — plus hearing protection if needed

    When servicing oil burners: safety glasses protect eyes from soot and debris; nitrile or latex gloves protect hands from oil and soot; a dust mask (FFP2 minimum) protects against soot particles containing carcinogens; hearing protection may be needed near running burners.

  2. What should be done with the old oil filter element during a service?

    Answer: Dispose of it as oil-contaminated hazardous waste through a licensed waste carrier

    Used oil filter elements are oil-contaminated waste and must be disposed of through proper hazardous waste channels. They should be placed in a sealed container or bag and taken away by the technician for proper disposal.

  3. What is the significance of the boiler's data plate during servicing?

    Answer: It provides essential information including model, serial number, input/output ratings, and correct nozzle size

    The data plate contains critical servicing information: manufacturer, model number, serial number, year of manufacture, rated input and output (kW), maximum working pressure, correct nozzle specification, and pump pressure setting.

  4. When commissioning a new oil boiler, what water treatment consideration applies?

    Answer: The system water should be treated with inhibitor to prevent corrosion and scale formation

    System water should be treated with a suitable corrosion inhibitor (to BS 8552) after flushing. This protects the boiler, radiators, and pipework from internal corrosion and scale. A system filter is also recommended. This is a Building Regulations requirement.

  5. What is the OFTEC recommended procedure for testing the lockout function of the burner control box?

    Answer: Close the oil supply valve and run the burner — it should lock out within the specified time period

    The lockout function is tested by closing the oil supply valve and attempting to start the burner. The control box should lock out within its specified time (typically 15-45 seconds) when no flame is detected. This confirms the safety shutdown works.

  6. What should a technician advise the customer about after completing a boiler service?

    Answer: The condition of the appliance, any recommendations, next service date, and importance of CO alarm maintenance

    The technician should explain the appliance's condition, any findings or recommendations, when the next service is due (typically 12 months), remind about CO alarm testing, and provide the service report. This helps the customer maintain their system safely.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. bpec.org.uk — Retake policy · verified Oct 2026
  2. oftec.org — Fees, renewal, eligibility, exam format, score validity, test delivery · verified Oct 2026
Commissioning and Servicing Flashcards — OFTEC Study Cards with Answers