← All NCT Flashcard Decks

Risk Assessment & Mitigation Flashcards

7 cards from real NCT practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Risk Assessment & Mitigation flashcards as text
  1. Which leading indicator is MOST predictive of future fleet collisions?

    Answer: Number of vehicles exceeding scheduled PM intervals

    PM compliance is a leading indicator because deferred maintenance increases the probability of mechanical failures that contribute to collisions.

  2. When a technician uses a torque wrench to tighten wheel lug nuts to specification, this is an example of which hazard control type?

    Answer: Engineering control

    Using a calibrated torque wrench is an engineering control that physically ensures the fastener is tightened correctly, independent of human judgment.

  3. A fleet risk assessment reveals high telematics-recorded harsh-braking events concentrated on a specific route segment. The MOST targeted mitigation is to:

    Answer: Investigate the route segment for signage, grade, or sight-line issues

    Concentrated harsh-braking at a route segment suggests a road condition or design issue that should be identified and corrected at the source.

  4. NAFA's fleet management standards recommend that accident review boards include which participant to ensure technical accuracy?

    Answer: A qualified fleet technician who can assess vehicle mechanical factors

    A qualified technician on the review board ensures that mechanical condition and maintenance history are properly evaluated as potential contributing factors.

  5. Which document serves as the primary legal record confirming that a pre-trip inspection was performed by a commercial driver?

    Answer: Driver Vehicle Inspection Report (DVIR)

    The DVIR is the federally required document that drivers must complete to certify pre-trip and post-trip inspections were performed.

  6. A risk mitigation plan assigns a completion date of 30 days for replacing worn CV axles fleet-wide. If the date passes with no action, the risk status should be updated to:

    Answer: Overdue/escalated — requiring management review and revised timeline

    Missed mitigation deadlines must be escalated so leadership can reallocate resources or accept the ongoing risk with full awareness.

  7. When evaluating supplier risk for a critical spare-parts vendor, which factor MOST directly affects fleet operational risk?

    Answer: Single-source dependency with no qualified backup supplier

    Single-source dependency means a supply disruption from that vendor can halt fleet maintenance, making it a high operational risk factor.

How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nafahq.org — Test delivery, eligibility, fees, exam format, passing score, renewal, retake fee, test dates, time limit, score validity · verified Oct 2026