Site Planning and Design Flashcards

6 cards from real NCARB practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Site Planning and Design flashcards as text
  1. What is the purpose of a zoning setback requirement?

    Answer: To establish minimum distances between buildings and property lines

    Setbacks mandate minimum distances from property lines to building walls, ensuring light, air, fire access, and visual separation between structures.

  2. Which term describes the ratio of a building's total floor area to the area of its site?

    Answer: Floor Area Ratio (FAR)

    FAR is calculated by dividing total gross floor area by total site area and is a key zoning tool for controlling development density.

  3. In site grading, what does a 2% minimum slope away from a building foundation accomplish?

    Answer: Directs surface water away from the structure to prevent basement infiltration

    A positive drainage slope of at least 2% away from foundations ensures surface water drains away rather than pooling against foundation walls.

  4. What is a floodplain, and why is it significant in site design?

    Answer: Land subject to periodic flooding; building in it requires elevated floors and FEMA compliance

    Floodplains are areas subject to inundation during flood events; FEMA regulations and local codes restrict development and require elevated construction within them.

  5. Which ADA requirement governs the maximum running slope of an accessible parking access aisle?

    Answer: 2% maximum slope in any direction

    ADA Standards require accessible parking spaces and their access aisles to have slopes no greater than 1:48 (approximately 2%) in any direction.

  6. What is the primary environmental purpose of a bioswale in site design?

    Answer: To filter and slow stormwater runoff using vegetation and soil

    Bioswales use graded channels with vegetation and engineered soil to filter pollutants and reduce stormwater runoff velocity before it enters the storm system.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. ncarb.org — Test delivery, eligibility, exam format, passing score, renewal, score release, time limit, score validity, fees, retake fee · verified Oct 2026