What is the primary purpose of requiring 'as-built drawings' at the end of a construction project?
-
A
To satisfy aesthetic requirements of the architect
-
B
To document actual field conditions and deviations from original plans
-
C
To allow the contractor to reuse designs on other projects
-
D
To meet OSHA documentation requirements