A TTC plan for a multi-lane highway requires a crossover for construction traffic. What is the primary concern when designing this crossover?
-
A
Maximizing construction vehicle speed through the crossover
-
B
Ensuring adequate sight distance and geometric design to prevent conflicts
-
C
Minimizing the number of signs required
-
D
Locating it as close to the work area as possible to save space