When a mini excavator consistently undercuts the specified trench depth by 2 inches, the FIRST corrective action should be:
-
A
Continue excavating and note the discrepancy in the log
-
B
Re-calibrate the depth indicator or verify bucket tooth wear
-
C
Request a new work order with adjusted depth specifications
-
D
Halt all excavation until a supervisor inspects the machine