← All MASS Flashcard Decks

Aptitude Flashcards

7 cards from real MASS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Aptitude flashcards as text
  1. If a machinist produces 12 parts in 3 hours, how many parts can they produce in an 8-hour shift at the same rate?

    Answer: 32

    The rate is 4 parts per hour, so 4 × 8 = 32 parts.

  2. Which number completes the sequence: 2, 6, 12, 20, 30, ___?

    Answer: 42

    The gaps increase by 2 each time (4, 6, 8, 10, 12), so 30 + 12 = 42.

  3. A blueprint uses a scale where 1 inch = 4 feet. How many feet does a 5.5-inch line represent?

    Answer: 22 feet

    5.5 × 4 = 22 feet.

  4. Which word is the odd one out: Hammer, Wrench, Pliers, Bolt?

    Answer: Bolt

    A bolt is a fastener, while the others are tools.

  5. If 3 workers complete a job in 12 hours, how long would it take 4 workers at the same rate?

    Answer: 9 hours

    Total work is 36 worker-hours, divided by 4 workers equals 9 hours.

  6. What is 15% of 240?

    Answer: 36

    0.15 × 240 = 36.

  7. A gear with 20 teeth meshes with a gear of 40 teeth. If the small gear turns twice, how many turns does the large gear make?

    Answer: 1 turn

    The larger gear turns at half the rate, so two turns of the small gear equal one turn of the large gear.