← All Lean Six Sigma Green Belt Certification Flashcard Decks

Lean Principles and Waste Flashcards

7 cards from real Lean Six Sigma Green Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Lean Principles and Waste flashcards as text
  1. Which Lean concept refers to leveling the production schedule to smooth out volume and mix variations over time?

    Answer: Heijunka

    Heijunka is the Lean practice of production leveling — distributing work evenly over time to avoid peaks and valleys that create waste and stress.

  2. When a Green Belt calculates process efficiency on a value stream map, what ratio is being computed?

    Answer: Value-added time divided by total lead time

    Process efficiency (or process cycle efficiency) is the ratio of value-added time to total lead time, often expressed as a percentage to highlight waste.

  3. A service team discovers they are entering the same customer data into three separate systems. Which waste type does this represent?

    Answer: Over-processing

    Redundant data entry across multiple systems is over-processing waste — performing more steps than necessary to deliver the required output.

  4. Which of the following Lean principles must be established before a pull system can function effectively?

    Answer: Create flow

    Flow must be established before pull can work — without continuous, uninterrupted flow, downstream signals cannot reliably pace upstream production.

  5. In a transactional process, which of the following is MOST likely classified as waiting waste?

    Answer: A loan application sitting in a queue for 3 days awaiting underwriter review

    A loan application sitting idle while awaiting review is classic waiting waste — work that is complete on one end but cannot proceed because a resource is unavailable.

  6. Which statement BEST distinguishes 'muda' from 'mura' in Lean terminology?

    Answer: Muda is waste; mura is unevenness or variation in workflow

    Muda means waste (non-value-added activity), while mura refers to unevenness or irregularity in the flow of work, both of which Lean seeks to eliminate.

  7. A team implements standard work instructions to ensure every operator performs a task the same way. Which Lean goal does this PRIMARILY support?

    Answer: Reducing variation and establishing a baseline for continuous improvement

    Standard work reduces process variation and creates a documented baseline from which kaizen improvements can be measured and sustained.