Which lean metric measures the percentage of time a process produces defect-free products at the required rate during planned production?
Answer: Overall Equipment Effectiveness (OEE)
OEE = Availability × Performance × Quality, representing the share of planned production time that is truly productive.
What is the main advantage of using a Box-Cox transformation in a Lean Six Sigma analysis?
Answer: It transforms non-normal data to approximate normality
The Box-Cox transformation applies a power function to data to make it more closely approximate a normal distribution for valid statistical analysis.
Which of the following is not a continuous data capability index?
Answer: Process Performance
Process Performance (Pp, Ppk) and Process Capability (Cp, Cpk) are specific indices used to assess process capability for continuous data. However, 'Process Performance' itself is not a continuous data capability index but rather a general term describing the overall performance of a process. The other options refer to specific, recognized statistical indices.
The limitations of control charts are the.
Answer: Voice of the process
Control charts are statistical tools that visually represent the performance of a process over time, distinguishing between common cause variation and special cause variation. They are often referred to as the 'voice of the process' because they show what the process is actually doing and its inherent capabilities and limits. While crucial for process monitoring, they do not directly reflect customer expectations or team opinions.
As a Lean Six Sigma project nears completion, which of the following is most critical for ensuring the sustainability of the gains achieved?
Answer: Developing a detailed Control Plan and formally handing it over to the process owner.
The Control Plan is the key deliverable of the Control phase and is essential for sustainability. It documents the new process, outlines the key metrics to monitor, sets control limits, and specifies the response plan if the process becomes unstable. Formally transferring ownership of this plan to the process owner ensures that the improvements are maintained long after the project team disbands.
What exactly does DFMEA mean?
Answer: Design Failure Mode and Effect Analysis
DFMEA stands for Design Failure Mode and Effect Analysis. It is a systematic proactive method used during the design phase of a product or process to identify potential failure modes, assess their severity, occurrence, and detectability, and prioritize actions to mitigate risks. The "Design" prefix specifies that this FMEA is applied to the product or process design itself, rather than manufacturing or system-level failures.
Which statistical tool is most appropriate for determining whether a statistically significant difference exists between the means of three or more independent groups?
Answer: One-way ANOVA
One-way ANOVA (Analysis of Variance) tests whether the means of three or more independent groups differ significantly by comparing within-group and between-group variance.
In SPC, tampering (also called over-adjustment) occurs when an operator:
Answer: Adjusts the process in response to common cause variation
Tampering is adjusting a process in reaction to common cause variation (random noise), which actually increases overall process variability — a concept illustrated by Deming's funnel experiment.
What does a significant interaction effect in a DOE indicate?
Answer: The effect of one factor depends on the level of another factor
A significant interaction means the combined effect of factors differs from the sum of their individual effects.
What is the primary purpose of calculating the Cp index during the Measure phase?
Answer: To assess the potential capability of a process assuming it is centered
Cp measures potential process capability by comparing the specification spread to the process spread, assuming the process is centered.
In the method of steepest ascent, what is the experimenter trying to accomplish?
Answer: Move systematically from the current experimental region toward the optimum response
After fitting a first-order model to screening data, the method of steepest ascent uses the estimated coefficients to define a path of experimentation that moves in the direction of the greatest increase in the predicted response. Experiments are run along this path until no further improvement is observed, at which point a higher-order (RSM) design is applied.
In a regression analysis, an R-squared value of 0.85 indicates what?
Answer: 85% of the variation in the output is explained by the input variables
R-squared represents the proportion of variance in the dependent variable that is predictable from the independent variables.
A Black Belt is selecting a sampling strategy to estimate the average transaction time across 12 regional call centers. The Black Belt suspects significant variation between centers but relative homogeneity within each center. Which sampling method is most appropriate?
Answer: Stratified random sampling
Stratified random sampling divides the population into homogeneous subgroups (strata — here, the 12 centers) and samples randomly within each, ensuring each stratum is represented and reducing overall variance in the estimate.
Which of the following BEST describes the Black Belt's responsibility when a key process owner resists proposed solutions during the Improve phase?
Answer: Engage the process owner to understand their concerns and incorporate valid feedback into the solution
Sustainable improvement requires buy-in from those who own and operate the process. Engaging resistant stakeholders to surface and address legitimate concerns not only improves the solution but also increases the likelihood of successful adoption and long-term control.
When is a short-run SPC approach most appropriate?
Answer: When production runs are too short to collect enough data for traditional control charts
Short-run SPC techniques such as standardized or deviation charts are used when production runs are too brief to establish meaningful control limits using traditional methods.
Which of the following best describes 'mura' in the context of lean waste?
Answer: Unevenness or variability in production flow
Mura refers to unevenness or inconsistency in work flow, which leads to the other wastes (muda) and overburdening (muri).
In Design of Experiments (DOE), what is a confounded effect?
Answer: An effect that cannot be separated from another effect due to the experimental design
Confounding occurs when the effect of one factor cannot be distinguished from the effect of another factor or interaction due to the design structure.
What is the correct formula for the Upper Control Limit of an X-bar chart using A2 factors?
Answer: UCL = X-double-bar + A2 × R-bar
The UCL for an X-bar chart is calculated as X-double-bar plus A2 times R-bar, where A2 is a factor based on subgroup size.
A process has Cp = 1.5 and Cpk = 0.8. What can be concluded about this process?
Answer: The process has adequate spread but is not centered between specifications
A Cp of 1.5 shows adequate spread relative to specifications, but a Cpk of 0.8 reveals the process mean is shifted significantly off-center.
The concept of _______ deals with the consistency of process workers?
Answer: Standard Operating Procedures
Standard Operating Procedures (SOPs) are detailed, written instructions that outline the correct way to perform routine tasks. Their primary purpose is to ensure consistency and quality in operations by providing a standardized method for all workers to follow. By adhering to SOPs, process workers can perform tasks uniformly, which directly addresses and improves the consistency of their work and the process outcomes.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
- peoplecert.org — Test dates · verified Oct 2026