  1. Which Lean enterprise principle focuses on creating an uninterrupted flow of value from raw materials to the end customer?

    Answer: Flow

    Flow is the Lean principle that emphasizes removing interruptions, bottlenecks, and delays so work moves continuously through the value stream.

  2. In a Lean enterprise, what is the primary purpose of a kaizen event?

    Answer: To achieve rapid, focused improvement on a specific process

    A kaizen event is a short-duration, focused improvement activity where a cross-functional team addresses a specific process problem and implements changes rapidly.

  3. What does the Lean concept of 'Gemba' refer to in an enterprise context?

    Answer: The actual place where work is performed

    Gemba means 'the real place' in Japanese and refers to going to where value-creating work actually happens to observe and understand processes firsthand.

  4. Which of the following best describes the Lean enterprise concept of 'pull' production?

    Answer: Initiating work only when there is actual downstream demand or a customer signal

    Pull production means work is triggered by actual customer demand rather than forecasts, reducing overproduction and excess inventory.

  5. What is the role of hoshin kanri in a Lean enterprise?

    Answer: It is the method for aligning strategic objectives across all organizational levels

    Hoshin kanri, or policy deployment, is a strategic planning methodology that cascades breakthrough objectives from top management through every level to ensure organizational alignment.

  6. In Lean enterprise thinking, which type of waste involves producing more than what the customer currently needs?

    Answer: Overproduction waste

    Overproduction is considered the most critical of the seven wastes because it directly leads to excess inventory, increased lead times, and masks other underlying problems.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
  2. peoplecert.org — Test dates · verified Oct 2026