← All Lean Six Sigma Black Belt Certification Flashcard Decks

Lean Six Sigma Black Belt Control Phase: SPC Questions and Answers Flashcards

6 cards from real Lean Six Sigma Black Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Lean Six Sigma Black Belt Control Phase: SPC Questions and Answers flashcards as text
  1. During the Control Phase, a Black Belt notices a trend of seven consecutive points moving upward on an X-bar chart. What does this pattern indicate?

    Answer: A special cause is present indicating a process shift or drift

    Seven consecutive points trending in one direction is a run rule violation indicating a systematic shift or drift in the process.

  2. What is the correct formula for the Upper Control Limit of an X-bar chart using A2 factors?

    Answer: UCL = X-double-bar + A2 × R-bar

    The UCL for an X-bar chart is calculated as X-double-bar plus A2 times R-bar, where A2 is a factor based on subgroup size.

  3. A process has Cp = 1.5 and Cpk = 0.8. What can be concluded about this process?

    Answer: The process has adequate spread but is not centered between specifications

    A Cp of 1.5 shows adequate spread relative to specifications, but a Cpk of 0.8 reveals the process mean is shifted significantly off-center.

  4. Which type of control chart would be most appropriate for monitoring the number of scratches per painted panel when each panel has the same surface area?

    Answer: c-chart

    A c-chart is used to monitor the count of defects per constant-size inspection unit, such as scratches on identical panels.

  5. What is the effect of increasing subgroup size on control chart sensitivity?

    Answer: Control limits narrow, making the chart more sensitive to shifts

    Larger subgroups reduce the standard error, narrowing control limits and making the chart more sensitive to detecting process shifts.

  6. An EWMA chart is preferred over a traditional Shewhart X-bar chart in which situation?

    Answer: When detecting small sustained shifts in the process mean

    EWMA charts weight recent and historical data to detect small, sustained shifts that Shewhart charts may miss.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
  2. peoplecert.org — Test dates · verified Oct 2026