What is the Average Run Length (ARL) of a standard Shewhart control chart with 3-sigma limits when the process is in control?
Answer: Approximately 370
With 3-sigma control limits, the false alarm probability is 0.27%, giving an in-control ARL of approximately 1/0.0027 = 370 samples before a false signal.
Which chart would be most appropriate for monitoring the number of scratches per windshield in an automotive plant?
Answer: A c chart
A c chart is used to monitor the count of defects per inspection unit when the sample size (area of opportunity) remains constant, making it ideal for counting scratches per windshield.
In EWMA chart construction, what effect does decreasing the smoothing constant (lambda) have?
Answer: It increases sensitivity to small process shifts while decreasing sensitivity to large shifts
A smaller lambda value places more weight on historical data, making the EWMA chart more sensitive to small, gradual shifts but potentially slower to react to large sudden shifts.
What condition must be met before calculating process capability indices like Cp and Cpk?
Answer: The process must first be demonstrated to be in statistical control
Process capability indices are only meaningful when calculated from a stable, in-control process because out-of-control processes have unpredictable behavior that invalidates capability estimates.
On a control chart, what type of variation do points within the control limits typically represent?
Answer: Common cause variation inherent to the process
Points within control limits represent common cause variation, which is the natural, inherent variability of the process that can only be reduced through fundamental process changes.
When is a short-run SPC approach most appropriate?
Answer: When production runs are too short to collect enough data for traditional control charts
Short-run SPC techniques such as standardized or deviation charts are used when production runs are too brief to establish meaningful control limits using traditional methods.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
- peoplecert.org — Test dates · verified Oct 2026