← All Lean Six Sigma Black Belt Certification Flashcard Decks

FREE Lean Six Sigma Black Belt Certification Prep Questions and Answers Flashcards

6 cards from real Lean Six Sigma Black Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 FREE Lean Six Sigma Black Belt Certification Prep Questions and Answers flashcards as text
  1. What is the primary difference between a push system and a pull system in Lean manufacturing?

    Answer: Pull systems produce based on actual customer demand while push systems produce based on forecasts

    A pull system triggers production only when downstream demand signals a need, whereas a push system relies on forecasted schedules that often create excess inventory.

  2. Which chart is most appropriate for monitoring the number of defects per unit when the sample size varies?

    Answer: u-chart

    The u-chart tracks defects per unit and accommodates varying sample sizes, unlike the c-chart which requires a constant sample size.

  3. In a Design of Experiments (DOE), what is a confounded effect?

    Answer: An effect that cannot be distinguished from another effect due to the experimental design

    Confounding occurs in fractional factorial designs when two or more effects are aliased together, making it impossible to determine which one caused the observed result.

  4. What does the term 'Muda' specifically refer to in Lean methodology?

    Answer: Any activity that consumes resources without creating value for the customer

    Muda refers to waste in all its forms—any activity or resource expenditure that does not add value from the customer's perspective.

  5. When performing a regression analysis, what does an R-squared value of 0.85 indicate?

    Answer: 85% of the variation in the response variable is explained by the predictor variables

    R-squared represents the proportion of variance in the dependent variable that is accounted for by the independent variables in the regression model.

  6. Which tollgate review occurs between the Analyze and Improve phases of DMAIC?

    Answer: The review confirming root causes have been statistically validated

    The Analyze-to-Improve tollgate verifies that root causes have been identified and statistically confirmed before the team invests resources in developing solutions.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
  2. peoplecert.org — Test dates · verified Oct 2026