  1. A Black Belt is planning a designed experiment and needs to study 5 factors. Which design would minimize the number of experimental runs while still estimating main effects?

    Answer: Plackett-Burman design with 12 runs

    Plackett-Burman designs are screening designs that efficiently estimate main effects in a minimal number of runs, making them ideal for 5 or more factors.

  2. What is the purpose of the Box-Cox transformation in Six Sigma analysis?

    Answer: To transform non-normal data to approximate normality for parametric analysis

    The Box-Cox transformation applies a power function to non-normal continuous data to make it more closely approximate a normal distribution for valid parametric testing.

  3. In a control chart, what pattern indicates a process that is out of statistical control due to a special cause?

    Answer: Eight consecutive points on one side of the center line

    Eight or more consecutive points on one side of the center line is one of the Western Electric rules indicating a non-random pattern caused by a special cause of variation.

  4. What is the relationship between DPMO and sigma level in Six Sigma methodology?

    Answer: Lower DPMO corresponds to a higher sigma level

    As defects per million opportunities decrease, the process sigma level increases, indicating better process performance.

  5. Which statistical test should a Black Belt use to compare the means of three or more groups with continuous, normally distributed data?

    Answer: One-way ANOVA

    One-way ANOVA tests whether there are statistically significant differences among the means of three or more independent groups with normally distributed continuous data.

  6. What is the primary goal of the Control phase in DMAIC?

    Answer: To sustain the gains achieved during the Improve phase through monitoring and standardization

    The Control phase focuses on sustaining improvements by implementing control plans, monitoring systems, and standardized procedures to prevent regression.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
  2. peoplecert.org — Test dates · verified Oct 2026