Advanced Lean and Enterprise Flashcards
6 cards from real Lean Six Sigma Black Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Advanced Lean and Enterprise flashcards as text
An enterprise is launching a major strategic initiative to increase market share by 20% over the next three years. To ensure alignment between this high-level objective, annual operational goals, specific improvement projects, and key performance metrics, which Lean enterprise tool is most appropriate?
Answer: Hoshin Kanri X-Matrix
The Hoshin Kanri X-Matrix is specifically designed to cascade and align strategic goals with tactical initiatives throughout an organization. It visually links long-term objectives (bottom), annual objectives (left), top-level priorities (top), and the metrics/targets to measure success (right), ensuring that daily activities support the overall strategy.
A core principle of Lean Accounting is to provide clear, timely, and easy-to-understand financial information that supports waste reduction. From a Lean perspective, what is a primary flaw of traditional standard cost accounting?
Answer: It often encourages overproduction to absorb fixed overhead and improve efficiency variances.
Traditional standard cost accounting can motivate non-lean behaviors. A key example is rewarding managers for high production volume to 'absorb' fixed overhead costs, which lowers the per-unit cost. This directly encourages the waste of overproduction, which Lean seeks to eliminate.
A company has mapped its entire order-to-cash process and identified a single department that is limiting the entire system's output. According to the Theory of Constraints' Five Focusing Steps, what is the immediate next step after identifying the constraint?
Answer: Exploit the constraint by maximizing its current capacity.
The Five Focusing Steps are: 1. Identify the constraint, 2. Exploit the constraint, 3. Subordinate everything else, 4. Elevate the constraint, 5. Repeat. The second step, 'Exploit,' involves getting the most output from the constraint using its existing resources, without yet making major investments.
A project is chartered to reorganize a specific manufacturing cell to improve flow and reduce ergonomic risks. The problem is well-understood, the scope is limited to the cell, and the cross-functional team needs to implement a solution within one week. Which methodology is best suited for this situation?
Answer: A Kaizen event
A Kaizen event is a short-duration (typically 3-5 days), highly focused improvement workshop designed for rapid implementation. It is ideal for situations where the problem is well-defined and the scope is narrow, distinguishing it from a full DMAIC project which is used for more complex problems with unknown root causes.
A key enterprise-level metric for Total Productive Maintenance (TPM) is the calculation of Overall Equipment Effectiveness (OEE). OEE provides a comprehensive view of asset utilization by combining which three factors?
Answer: Availability, Performance, and Quality
Overall Equipment Effectiveness (OEE) is a critical metric for measuring manufacturing productivity. It is calculated as the product of three key factors: Availability (uptime), Performance (speed vs. potential speed), and Quality (good parts vs. total parts).
The Shingo Model for Operational Excellence is built upon several guiding principles. Which of the following principles is considered a foundational 'Cultural Enabler' that must be in place to support all other improvement activities?
Answer: Respect Every Individual
The Shingo Model organizes its principles into three dimensions: Cultural Enablers, Continuous Improvement, and Enterprise Alignment. 'Respect Every Individual' and 'Lead with Humility' are the two principles that form the foundation of Cultural Enablers, which are essential for creating a culture where continuous improvement can thrive.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- iassc.org — Eligibility, fees, exam format, passing score, time limit, score validity, test delivery, retake policy · verified Oct 2026
- peoplecert.org — Test dates · verified Oct 2026