Control Phase: SPC Flashcards

7 cards from real Lean Six Sigma Black Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Control Phase: SPC flashcards as text
  1. On an X-bar chart, a process shows 8 consecutive points all above the centerline. What does this pattern indicate?

    Answer: A shift in the process mean

    Eight consecutive points on the same side of the centerline is a Western Electric run rule indicating a sustained shift in the process mean.

  2. Which SPC chart is most appropriate for monitoring the number of defects per unit when the sample size varies?

    Answer: u chart

    The u chart monitors defects per unit and accommodates variable sample sizes, unlike the c chart which requires constant sample size.

  3. Process capability index Cpk differs from Cp in that Cpk:

    Answer: Accounts for process centering as well as spread

    Cpk accounts for both process spread and the location of the process mean relative to specification limits, penalizing off-center processes.

  4. A control chart shows points within control limits but with a distinct sawtooth pattern alternating high-low-high-low. What is the most likely cause?

    Answer: Two distinct process streams mixed in sampling

    A consistent alternating pattern often indicates two process streams (e.g., two machines or shifts) being sampled alternately within subgroups.

  5. The Average Run Length (ARL) for a Shewhart X-bar chart with 3-sigma limits when the process is in control is approximately:

    Answer: 370

    For a 3-sigma control chart in control, the ARL is approximately 370, meaning a false alarm occurs on average every 370 subgroups.

  6. When establishing control limits for a new X-bar and R chart, the standard approach is to collect at least how many rational subgroups?

    Answer: 20-25

    A minimum of 20–25 subgroups is the standard recommendation to establish reliable control limits with adequate statistical stability.

  7. A process has Cp = 1.5 but Cpk = 0.8. What does this tell you?

    Answer: The process has adequate spread but is significantly off-center

    Cp = 1.5 shows the process spread fits within specs, but Cpk = 0.8 reveals the process mean is shifted toward or beyond a spec limit.