(KDOT) Certified Kansas Department of Transportation Inspector Practice Test

KDOT Geotechnical & Earthwork Inspection 4

Free · Instant Results

A KDOT inspector is overseeing slope grading on a fill embankment. The plan calls for a 2:1 (H:V) slope. If the embankment is 20 feet tall, what is the horizontal distance from the toe to the top edge of the slope?
▶ Start Practice Test