Under KDOT specifications, what is the consequence if a contractor fails to maintain required as-built (record) drawings?
-
A
No consequence; as-built drawings are optional on KDOT projects
-
B
KDOT may withhold final payment until acceptable as-built drawings are submitted
-
C
The contractor receives a bonus for early submission of as-built drawings
-
D
The resident engineer prepares as-built drawings and bills the contractor