← All IPAF Flashcard Decks

Overhead Hazards & Site Risks Flashcards

6 cards from real IPAF practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Overhead Hazards & Site Risks flashcards as text
  1. What is the minimum safe distance from overhead power lines when using a MEWP, and how is it determined?

    Answer: As specified by the Distribution Network Operator (DNO) for the specific line voltage — typically at least 6 metres for 11 kV and above

    Safe distance from overhead power lines depends on voltage and must be confirmed with the DNO. For distribution-level voltages (11 kV and above), the minimum is typically 6 metres, but this must always be confirmed for the specific line.

  2. What physical controls should be in place when a MEWP operates near overhead power lines?

    Answer: Goal posts and height restrictors that physically prevent the MEWP from approaching the exclusion zone

    Physical controls — goal posts and height restrictors — must be in place to prevent the MEWP from physically entering the exclusion zone around power lines. Signage and verbal briefing alone are insufficient.

  3. What is 'flashover' when a MEWP boom approaches an overhead power line?

    Answer: Electricity arcing from the line to the MEWP boom without direct contact, potentially killing the operator and persons on the ground

    Flashover is the arcing of high-voltage electricity from a power line to the MEWP before direct contact, through the air gap. It can instantly kill the operator and any person touching the machine on the ground.

  4. What should an operator do if the MEWP inadvertently contacts an overhead power line?

    Answer: Stay in the platform, warn people not to touch the machine, and call the emergency services — do not attempt to climb down

    If the MEWP contacts a power line, the operator is safer staying in the platform (the machine provides some insulation) than attempting to descend. Persons on the ground must not touch the machine. Emergency services must be called immediately.

  5. What pre-task planning is required before using a MEWP in an area with overhead hazards?

    Answer: Survey the work area for all overhead hazards, consult with relevant authorities, establish exclusion zones, and confirm the MEWP's maximum height does not create risk

    Pre-task planning for overhead hazards includes a full survey of the work area, consultation with DNOs or relevant authorities, establishing exclusion zones with physical controls, and confirming the machine's reach is safe.

  6. What hazard do suspended ceilings or fragile roofing materials present to MEWP operations indoors?

    Answer: Contact with the MEWP boom or platform can dislodge material, creating falling object risk and damaging structures that may be load-bearing

    Contact with suspended ceilings or fragile roofing can dislodge material that falls on workers below. Some suspended ceiling structures may also be load-bearing or house services, making contact particularly hazardous.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. ipaf.org — Eligibility, renewal, test delivery, score validity, exam information · verified Oct 2026