Which HUD regulation requires an environmental review before committing federal funds to a housing project?
Answer: 24 CFR Part 58 (Environmental Review Procedures)
24 CFR Part 58 establishes environmental review requirements that must be completed before HUD funds are committed, delegating review authority to Responsible Entities such as local governments.
What is a 'Phase I Environmental Site Assessment' (ESA) and when does HUD require one?
Answer: A review of historical records and site reconnaissance to identify recognized environmental conditions before HUD fund commitment
A Phase I ESA identifies recognized environmental conditions (RECs) such as underground storage tanks or prior industrial use through records review and site inspection, required by HUD for applicable projects.
Under HUD regulations, what does 'clearance testing' verify after lead hazard control work?
Answer: That dust lead levels on floors, window sills, and troughs meet HUD's post-work clearance standards
Clearance testing after lead hazard control work measures dust lead loading on floors, window sills, and window troughs to verify levels meet HUD's post-work standards before reoccupancy.
A HUD inspector finds visible black mold on bathroom walls and a strong musty odor. What is the appropriate action under HQS?
Answer: Document as a fail requiring remediation because mold is a health hazard under HQS
Visible mold is a health hazard and an HQS fail; the cause must be identified and remediated because mold indicates excessive moisture and can cause respiratory health problems.
Under HUD's Site and Neighborhood Standards, which condition would disqualify a site for assisted housing?
Answer: Location in an area with an unacceptable environmental health or safety hazard that cannot be mitigated
HUD's Site and Neighborhood Standards prohibit assisted housing in locations with unmitigable environmental health or safety hazards such as active contamination, severe air quality violations, or explosive risk.
What is 'interim controls' for lead hazards as defined under HUD's Lead Safe Housing Rule?
Answer: Temporary measures that reduce lead exposure while a permanent solution is developed
Interim controls are measures such as paint stabilization, specialized cleaning, and friction/impact surface treatment that temporarily reduce lead exposure pending a longer-term solution.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- hud.gov — Eligibility, exam information · verified Nov 2026
- hudexchange.info — Test delivery · verified Nov 2026