A large metropolitan planning organization is initiating the process of developing an enterprise GIS to serve multiple departments, including transportation, emergency services, and environmental planning. To ensure the resulting system is effective and widely adopted, what is the most critical first step in the system design process?
-
A
Purchasing high-performance server hardware and networking equipment.
-
B
Conducting a comprehensive user needs assessment and requirements analysis.
-
C
Selecting a specific GIS software vendor and database platform.
-
D
Designing the final enterprise geodatabase schema and data model.