  1. Under the NEC, what is the maximum circuit breaker size permitted for a 20-ampere-rated, 120V household receptacle circuit using 12 AWG copper wire?

    Answer: 20 amperes

    12 AWG copper wire has an ampacity that permits a maximum 20-ampere overcurrent device for a standard 120V branch circuit under the NEC.

  2. A contractor discovers the water supply pressure at a residential project measures 95 psi. What corrective action is required by code?

    Answer: Install a pressure reducing valve (PRV) to bring pressure below 80 psi

    The IRC requires a pressure reducing valve when water supply pressure exceeds 80 psi to protect plumbing fixtures and appliances from damage.

  3. What type of pipe expansion joint is required when installing long runs of copper water supply pipe to accommodate thermal expansion?

    Answer: Expansion loop or offset

    Long copper pipe runs require expansion loops or offsets to absorb thermal expansion and prevent stress cracking at joints and fittings.

  4. According to NFPA 70 (NEC), arc-fault circuit interrupter (AFCI) protection is required in which residential area?

    Answer: All 120V, 15A and 20A branch circuits in dwelling unit bedrooms and most living areas

    NEC requires AFCI protection on all 120V, 15A and 20A branch circuits serving bedrooms and most other living areas in dwelling units to prevent arc-fault fires.

  5. What is the primary purpose of a condensate neutralizer installed on a high-efficiency (condensing) gas furnace?

    Answer: Raise the pH of acidic condensate before it enters the sanitary drain

    High-efficiency condensing furnaces produce acidic condensate (pH 2–4) that can corrode pipes and violate codes; a neutralizer raises pH to an acceptable level before discharge.

  6. When a general contractor subcontracts electrical work, who is ultimately responsible for ensuring all electrical installations meet NEC and local code requirements?

    Answer: The general contractor, as the licensed contractor of record on the permit

    The general contractor holds the permit and bears ultimate responsibility for ensuring all subcontracted work, including electrical, complies with applicable codes.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. cslb.ca.gov — Fees, renewal · verified Oct 2026
  2. web.cslb.ca.gov — Test delivery, exam format, retake policy, score release, score validity · verified Oct 2026
  3. test-takers.psiexams.com — Exam format, passing score, retake policy, score release, time limit, score validity · verified Oct 2026
  4. psiexams.com — Eligibility · verified Oct 2026
  5. www2.myfloridalicense.com — Registration deadline, exam format, passing score, test delivery · verified Oct 2026