A contractor discovers that concrete was poured during freezing temperatures without proper cold-weather protection. What is the most immediate quality concern?
-
A
Surface scaling only
-
B
Increased curing time with no structural effect
-
C
Reduced compressive strength due to ice crystal formation disrupting hydration
-
D
Color variation in the finished surface