GCC Cheat Sheet 2026
The 30 highest-yield GCC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.
125 questions
240 min time limit
70.00% to pass
- What is the purpose of a Safety Data Sheet (SDS)? → To document chemical safety information
- What is the primary purpose of building codes? → To ensure minimum standards for safety, health, and structural integrity
- Which OSHA regulation outlines general safety and health provisions in construction? → OSHA 1926 Subpart C
- When terminating a subcontractor for default, the general contractor must typically: → Provide written notice and a cure period as specified in the subcontract
- Why is a project scope statement important? → To define project goals and deliverables
- What is retainage in construction contracts? → Withheld portion of payment until completion
- What documentation should accompany quality control activities? → Test reports, inspection checklists, non-conformance reports, and corrective actions
- A Stormwater Pollution Prevention Plan (SWPPP) must be prepared: → Before land disturbance begins
- A 'flow-down clause' in a subcontract requires that: → Subcontractors comply with all applicable prime contract terms
- Which type of insurance is commonly required on construction projects? → General liability insurance
- When should a risk register be updated? → Continuously as new risks emerge and existing risks change
- What is the consequence of practicing outside the defined scope of practice? → Potential license revocation, legal liability, and risk to public safety
- Under most U.S. state lien statutes, when does the deadline to file a mechanics lien typically begin to run? → From the date the claimant last furnished labor or materials to the project
- Why is stakeholder communication important in project management? → It ensures expectations are managed and decisions are informed and timely
- What factor most commonly causes project cost overruns? → Inadequate scope definition and uncontrolled scope changes
- Which financial statement provides the best view of an organization's profitability? → The income statement showing revenues, expenses, and net profit
- What is a change order in construction? → An amendment to contract scope or cost
- What is the first step in the risk management process? → Identify potential risks through systematic analysis
- A subcontractor 'default' occurs when: → The subcontractor fails to perform contractual obligations
- What is the primary purpose of regulatory compliance in professional practice? → To protect public safety and ensure minimum standards of care
- Which entity typically adopts and enforces building codes? → Local building authorities
- How should variance analysis be used in financial management? → To identify and investigate significant differences between planned and actual results
- When a vendor delivers materials that do not meet project specifications, the general contractor should first: → Reject the materials and issue a formal written nonconformance notice
- What is the purpose of a building permit? → To authorize work that meets code
- What is the primary purpose of quality control inspections? → To verify work meets specified standards and identify deficiencies early
- What is the consequence of practicing outside the defined scope of practice? → Potential license revocation, legal liability, and risk to public safety
- A contractor discovers underground storage tanks (USTs) on a demolition site. The first regulatory step is to: → Notify the appropriate state environmental agency and assess for leaks
- Which document is essential to initiate legal construction work? → Construction contract
- What should be done when materials do not meet specifications? → Reject the materials, document the non-conformance, and notify the supplier
- What must be completed before using any specialized equipment? → Verify proper calibration and review safety procedures