Free NCCCO Tower Crane Operator Test 1

0%

What minimal space between any portion of the crane or load and 850kV energized overhead power wires must be maintained, per OSHA 1926.1408?

Correct! Wrong!

When the load moment indicator (LMI) on a crane malfunctions, what should an operator do?

Correct! Wrong!

What is the load hoisting sheaves minimum pitch diameter?

Correct! Wrong!

Before an operator exits the crane, he has to:

Correct! Wrong!

Boom length and angle can be utilized in a range diagram to ascertain

Correct! Wrong!

How many line segments are needed to lift a 36,500 lb object? load if 9,000 pounds is the highest permitted line pull?

Correct! Wrong!

When a crane operator gives two audible signals while operating the machine, what does it mean?

Correct! Wrong!

When the crane’s boom length is in between the lengths indicated in the load chart, which capacity should you use?

Correct! Wrong!

What does the term “operating radius” mean?

Correct! Wrong!

When a crane’s boom is lowered, what happens to the load’s leverage?

Correct! Wrong!

An auxiliary boom point sheave, sometimes known as a rooster sheave, is used primarily to:

Correct! Wrong!

Premium Tests $49/mo
FREE December-2024