FREE Building Information Modeling Question and Answers

0%

A list of the material quantities utilized in creating a structure.

Correct! Wrong!

Explanation:
The term "material take off list" (MTOL) refers to the list of supplies needed for construction. An all-inclusive catalog or list, with listing columns for shower heads, doorknobs, roofing materials, lumber, cement, concrete, windows, sockets, and other items, makes up a material take-off sheet.

The virtual building model, often known as the BIM model, is the basis of a BIM project.

Correct! Wrong!

Explanation:
A building information model, also referred to as an accurate virtual model of a building, is created using BIM technology. By the time it is finished, the building information model will have all the accurate geometry and pertinent information it needs to enable the design, purchasing, fabrication, and construction processes necessary to actualize the building.

A typical CADD procedure produces ______ drawings to represent the building.

Correct! Wrong!

Explanation:
The practice of employing software to create 2D technical blueprints or outlines for a product, building, part, or other forms of thing is known as 2D CAD drafting.

Comprehensive ___ standards have been adopted by some European nations.

Correct! Wrong!

Explanation:
The Scandinavian countries have had BIM legislation in place for for ten years, despite the UK's efforts to be a BIM leader with its globally significant program. Programs in France, Germany, and Spain are advancing quickly. Before the UK, Dubai, China, Hong Kong, and Singapore also had legislation in place.

The appointment of a ______ is one of the initial steps in implementing BIM.

Correct! Wrong!

Explanation:
The BIM Manager oversees how a company applies their BIM workflow. They frequently play a major role in deciding whether software, processes, and BIM standards will be applied across the board in a company. They are therefore a crucial component of any contemporary architecture or design practice.

A model where each object's characteristics can be changed.

Correct! Wrong!

Explanation:
The 3D models known as parametric models include adjustable parameters that let you change their 3D structure. You can import parametric models made with a dobe Substance 3D Designer into Stager.

A file that can be applied to a new project that is preconfigured with settings, model content, and views.

Correct! Wrong!

Explanation:
A project template is a pre-made structure that makes it simple and quick to begin a project. With only one click, a new project can be created using a pre-defined template. You must specify the requirements for project templates when it comes to projects.

Premium Tests $49/mo
FREE December-2024