Project Planning and Initiation Flashcards
6 cards from real FMP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Project Planning and Initiation flashcards as text
What is the primary benefit of conducting a needs assessment before initiating a facility project?
Answer: It ensures the project addresses actual organizational requirements rather than assumed needs
Needs assessments validate that the proposed project addresses real organizational requirements.
Which project delivery method gives the facility owner the most control over design details?
Answer: Design-bid-build
Design-bid-build separates design and construction, giving maximum control over design decisions.
What is the purpose of establishing project success criteria during the initiation phase?
Answer: To define measurable standards by which project completion and performance will be evaluated
Success criteria establish clear, measurable standards for objective evaluation at completion.
What is the most effective approach to estimating costs during early project planning?
Answer: Using parametric estimating with historical data adjusted for current conditions
Parametric estimating uses historical data and statistical relationships adjusted for current conditions.
Why is it important to identify project constraints during the planning phase?
Answer: Constraints define the boundaries within which the project must operate, affecting all subsequent decisions
Identifying constraints early ensures planning accounts for real limitations.
What is the value of developing a communication plan during project initiation?
Answer: It defines who receives what information, through which channels, and at what frequency
A communication plan ensures all stakeholders receive appropriate information through preferred channels.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- ifma.org — Eligibility, exam format, test delivery, passing score, renewal, retake policy, score release, score validity, exam information · verified Oct 2026