Emergency Preparedness and Business Continuity Flashcards
21 cards from real FMP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 20 Emergency Preparedness and Business Continuity flashcards as text
What is the primary purpose of a Business Continuity Plan (BCP) in facility management?
Answer: To ensure critical business functions continue during and after a disruption
A Business Continuity Plan ensures that critical business operations can continue or be quickly restored during and after a disaster or disruption.
What does RPO (Recovery Point Objective) represent in business continuity planning?
Answer: The maximum acceptable amount of data loss measured in time
RPO defines the maximum tolerable period of data loss, representing how far back in time recovery systems must restore data after a disruption.
Which international standard provides the framework for Business Continuity Management Systems?
Answer: ISO 22301
ISO 22301 is the international standard specifically designed for Business Continuity Management Systems, providing requirements for planning, establishing, implementing, and improving a BCMS.
In emergency preparedness, what does COOP stand for?
Answer: Continuity of Operations Plan
COOP stands for Continuity of Operations Plan, which outlines how an organization will maintain essential functions during a wide range of emergencies.
What is the Recovery Time Objective (RTO) in business continuity planning?
Answer: The maximum tolerable downtime before business operations must be restored
RTO is the maximum acceptable length of time that a business process can be offline after a failure or disaster before the impact becomes unacceptable.
Which of the following is a key first step when developing an emergency response plan for a facility?
Answer: Conducting a hazard identification and risk assessment
A hazard identification and risk assessment is the foundational first step, as it identifies potential threats and their likelihood, which drives all subsequent planning decisions.
Under OSHA's Emergency Action Plan standard (29 CFR 1910.38), which of the following is a required element?
Answer: Procedures for reporting fires and other emergencies
OSHA 29 CFR 1910.38 requires Emergency Action Plans to include procedures for reporting fires and emergencies as a minimum required element.
What is a Business Impact Analysis (BIA) and why is it critical in emergency preparedness?
Answer: An assessment that identifies critical functions and quantifies the impact of disruptions on them
A BIA identifies which business functions are most critical and quantifies the operational and financial impact of disrupting them, which drives prioritization in the BCP.
What is a 'hot site' in the context of disaster recovery planning?
Answer: A fully equipped alternate location that can take over operations immediately
A hot site is a fully operational duplicate facility with hardware, software, and network infrastructure that can assume operations immediately after a primary site failure.
What is the primary purpose of a tabletop exercise in emergency preparedness?
Answer: To discuss and walk through emergency response procedures without real-world execution
A tabletop exercise is a discussion-based session where team members walk through a simulated emergency scenario to identify gaps in their plans without physically mobilizing resources.
In facility management, what does 'redundancy' mean in the context of business continuity?
Answer: Duplicating critical systems or components so operations continue if one fails
Redundancy involves duplicating critical systems, equipment, or processes so that if one component fails, another immediately takes over, ensuring continuity of operations.
According to NFPA 110, which classification describes a generator that must start and accept full load within 10 seconds of a power outage?
Answer: Class 10
NFPA 110 Class 10 emergency power systems must reach full load within 10 seconds of interruption of normal power, as required for critical applications like hospitals.
Which evacuation method is most appropriate for high-rise buildings when not all floors need to evacuate simultaneously?
Answer: Staged or phased evacuation
Staged or phased evacuation moves the floor of the incident and adjacent floors first, preventing dangerous overcrowding in stairwells while still protecting occupants in the threat zone.
What distinguishes a 'warm site' from a 'cold site' in disaster recovery?
Answer: A warm site has some infrastructure pre-installed; a cold site requires full setup from scratch
A warm site has partial infrastructure (hardware, network) already in place and can be operational within hours to days, while a cold site is essentially an empty space requiring full setup.
What is the Incident Command System (ICS), and why is it used in emergency management?
Answer: A standardized management structure that coordinates emergency response across agencies
ICS is a standardized, hierarchical management system that enables coordinated response from multiple agencies and organizations during an emergency, ensuring clear command and communication.
How frequently should emergency response plans generally be reviewed and updated, at minimum?
Answer: Annually or after any significant change to the facility or organization
Best practice and many regulations require emergency plans to be reviewed at least annually and updated whenever significant facility changes, personnel changes, or post-incident lessons are identified.
In an emergency communication plan, which element is most critical for ensuring effective information flow during a crisis?
Answer: Designating a single spokesperson and establishing clear communication channels in advance
A designated spokesperson and pre-established communication channels prevent conflicting messages, ensure consistent information, and enable rapid, coordinated responses during emergencies.
What is the purpose of conducting regular fire drills in a facility?
Answer: To familiarize occupants with evacuation routes and procedures so they respond effectively during an actual emergency
Regular fire drills ensure that all building occupants know evacuation routes and procedures, reducing panic and improving response effectiveness during an actual fire emergency.
Which of the following best describes a 'shelter-in-place' directive?
Answer: A directive for occupants to remain inside the building and move to a safe interior area
Shelter-in-place directs occupants to stay inside the building and move to a pre-designated interior safe area, typically used during external threats like chemical spills or severe weather.
What is the role of an Emergency Operations Center (EOC) in facility emergency management?
Answer: A centralized location where emergency response is coordinated and decisions are made during a crisis
An EOC serves as the central hub where key personnel gather to coordinate resources, make decisions, and manage communications during an emergency or disaster event.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy