FEMA Risk Management & Safety Protocols — Questions and Answers
Question 1: In the hierarchy of hazard controls, which control is considered the MOST effective?
- Personal protective equipment
- Administrative controls
- Elimination of the hazard (Correct answer)
- Engineering controls
Correct answer: Elimination of the hazard
Elimination physically removes the hazard and is ranked highest in the hierarchy of controls, while PPE is the least effective.
Question 2: Under the ICS, who has the authority to immediately stop or prevent unsafe acts during incident operations?
- Operations Section Chief only
- Safety Officer (Correct answer)
- Liaison Officer
- Planning Section Chief
Correct answer: Safety Officer
The Safety Officer has emergency authority to stop or prevent unsafe acts and must then inform the Incident Commander.
Question 3: Which ICS form documents the hazard analysis and mitigations for each work assignment and helps the Safety Officer build the safety message?
- ICS 201
- ICS 215A (Correct answer)
- ICS 213
- ICS 209
Correct answer: ICS 215A
The ICS 215A Incident Action Plan Safety Analysis identifies hazards and mitigations for tactical assignments.
Question 4: How often must a jurisdiction's THIRA be completed under current FEMA guidance?
- Every year
- Every two years
- Every three years (Correct answer)
- Every five years
Correct answer: Every three years
Since 2018 FEMA requires the THIRA every three years, while the Stakeholder Preparedness Review is done annually.
Question 5: A county buys flood insurance for its public buildings instead of elevating them. Which risk management strategy is this?
- Risk avoidance
- Risk transfer (Correct answer)
- Risk acceptance
- Risk reduction
Correct answer: Risk transfer
Insurance shifts the financial consequences of a loss to another party, which is risk transfer.
Question 6: Which OSHA standard governs Hazardous Waste Operations and Emergency Response (HAZWOPER) for responders?
- 29 CFR 1910.134
- 29 CFR 1926.501
- 29 CFR 1910.120 (Correct answer)
- 29 CFR 1910.1030
Correct answer: 29 CFR 1910.120
29 CFR 1910.120 sets HAZWOPER training and safety requirements, including emergency response to hazmat releases.
Question 7: During a hazmat response, in which zone is decontamination of personnel and equipment performed?
- Hot zone (exclusion zone)
- Warm zone (contamination reduction zone) (Correct answer)
- Cold zone (support zone)
- Staging area
Correct answer: Warm zone (contamination reduction zone)
The warm zone is the contamination reduction corridor between the hot and cold zones where decon happens.
Question 8: A responder must enter an unknown atmosphere with high vapor hazard to skin and eyes. Which EPA level of protection is required?
- Level A (Correct answer)
- Level B
- Level C
- Level D
Correct answer: Level A
Level A provides a fully encapsulating vapor-tight suit with SCBA for the highest respiratory and skin protection.
Question 9: What is the minimum benefit-cost ratio generally required for a mitigation project to be considered cost-effective under FEMA HMA programs?
- 0.5
- 0.75
- 1.0 (Correct answer)
- 2.0
Correct answer: 1.0
A BCR of 1.0 or greater shows that project benefits equal or exceed costs.
Question 10: Under the Disaster Mitigation Act of 2000, how often must local hazard mitigation plans be updated and re-approved to stay eligible for HMA funding?
- Every 2 years
- Every 3 years
- Every 5 years (Correct answer)
- Every 10 years
Correct answer: Every 5 years
Local hazard mitigation plans must be reviewed, updated, and re-approved by FEMA every five years.
Question 11: Which wildland firefighting safety acronym stands for Lookouts, Communications, Escape routes, and Safety zones?
- PACE
- LCES (Correct answer)
- SALUTE
- RACE
Correct answer: LCES
LCES is the core wildland safety system that must be established before engaging a fire.
Question 12: In the FEMA risk formula, risk is commonly expressed as a function of which three factors?
- Threat, vulnerability, and consequence (Correct answer)
- Frequency, budget, and staffing
- Hazard, response time, and cost
- Probability, population, and geography
Correct answer: Threat, vulnerability, and consequence
Risk is generally assessed as a combination of threat/hazard likelihood, vulnerability, and consequence.
Question 13: How far from doors, windows, and vents does CDC recommend placing a portable generator to reduce carbon monoxide risk?
- At least 5 feet
- At least 10 feet
- At least 20 feet (Correct answer)
- Distance doesn't matter if a window is open
Correct answer: At least 20 feet
CDC advises operating portable generators outdoors at least 20 feet from openings to prevent CO poisoning.
Question 14: What does a Personnel Accountability Report (PAR) confirm during an incident?
- Equipment inventory status
- That all assigned personnel are accounted for (Correct answer)
- Financial cost of resources used
- Weather conditions at the scene
Correct answer: That all assigned personnel are accounted for
A PAR is a roll call by supervisors confirming that every assigned member is accounted for.
Question 15: How much moving water can knock an adult off their feet, according to the National Weather Service?
- 6 inches (Correct answer)
- 18 inches
- 2 feet
- 3 feet
Correct answer: 6 inches
Just 6 inches of fast-moving water can knock down an adult, which is why 'Turn Around Don't Drown' is stressed.
Question 16: A state with an approved Enhanced State Mitigation Plan may receive HMGP funding of up to what percentage of estimated disaster assistance?
- 7.5%
- 15%
- 20% (Correct answer)
- 25%
Correct answer: 20%
Enhanced plans raise the HMGP ceiling from 15% to 20% of estimated aggregate disaster assistance, subject to sliding scales.
Question 17: Which statement BEST describes residual risk?
- Risk that has been fully eliminated
- Risk remaining after mitigation measures are applied (Correct answer)
- Risk caused only by human error
- Risk that applies only to infrastructure
Correct answer: Risk remaining after mitigation measures are applied
Residual risk is the risk left over once controls and mitigation have been put in place.
Question 18: Which FEMA tool provides a nationwide, county- and census-tract-level score combining expected annual loss, social vulnerability, and community resilience?
- Hazus
- National Risk Index (Correct answer)
- CAP-SSSE
- WebEOC
Correct answer: National Risk Index
The National Risk Index combines expected annual loss, social vulnerability, and community resilience into risk scores.
Question 19: Responders working in high heat should follow which practice to reduce heat-related illness?
- Drink only when thirsty
- Use acclimatization and scheduled work-rest cycles with regular hydration (Correct answer)
- Work through breaks to finish sooner
- Wear heavier clothing to block the sun
Correct answer: Use acclimatization and scheduled work-rest cycles with regular hydration
OSHA and NIOSH recommend acclimatization, rest cycles, shade, and frequent hydration to prevent heat illness.
Question 20: When debris crews come across a downed power line, what is the correct safety assumption?
- It is safe if not sparking
- It is energized and dangerous until the utility confirms otherwise (Correct answer)
- It is safe after rain stops
- It can be moved with a dry wooden stick
Correct answer: It is energized and dangerous until the utility confirms otherwise
Treat every downed line as energized and keep away until the utility de-energizes it.
Question 21: In a risk matrix, an event with low likelihood but catastrophic consequences should generally be:
- Ignored because it is unlikely
- Assessed and considered for mitigation or contingency planning (Correct answer)
- Treated as identical to a frequent minor event
- Handled only after it happens
Correct answer: Assessed and considered for mitigation or contingency planning
Low-probability, high-consequence events still need assessment and planning because their impacts can be severe.
In the hierarchy of hazard controls, which control is considered the MOST effective?
What Practice Test Geeks adds beyond an AI chat for FEMA
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length FEMA mock exam — 120 questions in 150 minutes with a 75% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed FEMA question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- A printable FEMA cheat sheet you can print or save as a PDF.
- FEMA flashcards built from the same question bank.
These practice questions were written with AI tools. They are not real exam questions. We have not yet matched this exam's facts to an official source, so confirm fees, dates and rules with the exam body. Not reviewed by a subject-matter expert. Editorial policy