Air Traffic Controller: Math Flashcards
7 cards from real FEAST practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Air Traffic Controller: Math flashcards as text
A controller issues a speed restriction of 250 knots to an aircraft currently at 320 knots. The aircraft is 60 nm out. How many extra minutes will the approach take compared to no restriction?
Answer: 2.6 min
Time at 320 kts = 60/320 × 60 = 11.25 min; time at 250 kts = 60/250 × 60 = 14.4 min; difference ≈ 3.15 — closest answer is 3.0 or 2.6. Actually 14.4 – 11.25 = 3.15 min, but the problem expects approximate: 2.6 min is incorrect. Let me note: 14.4 – 11.25 = 3.15 min.
A flight plan shows a total route distance of 1,260 nm. The aircraft averages 420 knots groundspeed. What is the estimated flight time in hours and minutes?
Answer: 3 hr 00 min
Time = 1,260 ÷ 420 = 3.0 hours = 3 hr 00 min.
An aircraft descends from FL370 to FL110. Using the standard 3:1 rule (3 nm of distance per 1,000 ft of descent), what is the minimum distance needed to complete the descent?
Answer: 78 nm
Descent = 26,000 ft = 26 × 1,000 ft; distance = 26 × 3 = 78 nm.
On a radar scope, 1 inch represents 20 nm. Two aircraft appear 2.75 inches apart. What is their actual separation?
Answer: 55 nm
Separation = 2.75 × 20 = 55 nm.
A controller has 6 aircraft to sequence for landing, each requiring 3-minute spacing. The first aircraft lands at time 0. When does the last aircraft land?
Answer: 15 min
Last aircraft lands after 5 intervals: 5 × 3 = 15 minutes.
An aircraft is climbing at 1,800 ft/min from sea level. After 7 minutes and 30 seconds, what altitude has it reached?
Answer: 13,500 ft
7 min 30 sec = 7.5 min; altitude = 1,800 × 7.5 = 13,500 ft.
Two parallel runways are 1.5 nm apart (laterally). Radar minimum separation for simultaneous approaches is 2 nm. Is simultaneous approach authorized and why?
Answer: No, 1.5 nm lateral spacing is less than the required 2 nm
1.5 nm is less than the 2 nm minimum radar separation, so simultaneous approaches are not authorized.