Read the following:
'Rapid Intervention Teams (RIT), also called Rapid Intervention Crews (RIC), are dedicated crews assigned solely to rescue firefighters who become lost, trapped, or injured inside a structure. NFPA 1710 requires that a RIT be assembled and ready before interior firefighting operations begin. The RIT must be equipped with tools appropriate for rescuing a downed firefighter, including rescue rope, spare SCBA, and forcible entry tools.'
What does NFPA 1710 require regarding RIT according to the passage?
-
A
RIT must enter the structure immediately upon arrival
-
B
RIT should be assembled after the fire is controlled
-
C
RIT must be assembled and ready before interior operations begin
-
D
RIT carries only rope and SCBA equipment