  1. In a curtain wall high-rise, what construction gap is a major path for vertical fire spread between floors?

    Answer: The space between the floor slab edge and the exterior curtain wall

    Unsealed slab-edge gaps at the curtain wall let fire and smoke travel directly to the floor above.

  2. What is the material used to seal the slab-edge gap at a curtain wall, preventing fire from moving floor to floor?

    Answer: Perimeter fire barrier (safing) insulation

    Safing is rated fire-resistant material that fills the perimeter gap between the slab edge and the curtain wall.

  3. Structural steel loses a significant portion of its strength when it reaches roughly what temperature?

    Answer: About 1,000–1,100°F

    Unprotected steel loses roughly half its strength at about 1,000–1,100°F, which is why it needs fireproofing.

  4. Spray-applied fire-resistive material (SFRM) on structural steel serves what purpose?

    Answer: It insulates the steel to delay temperature rise and loss of strength

    SFRM insulates steel members so they reach critical temperatures more slowly during a fire.

  5. During a building inspection, the FLSD notices fireproofing material has been scraped off beams above a ceiling. What should be done?

    Answer: Report it so the fireproofing is restored, as structural fire resistance is compromised

    Damaged fireproofing reduces the fire-resistance rating of the structure and must be repaired.

  6. Which type of building core layout places elevators, stairs, and shafts in the middle of the floor plate?

    Answer: Center core

    In a center core building, the stairs, elevators, and utility shafts are grouped at the center of each floor.

  7. What is a key fire safety concern with a central HVAC system serving multiple floors of a high-rise?

    Answer: It can distribute smoke to floors far from the fire

    Shared ductwork can carry smoke throughout the building unless dampers and shutdown controls operate.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nyc.gov — Test delivery, fees, exam format, passing score, registration deadline, renewal, retake fee, retake policy, score release, test dates · verified Oct 2026