← All F80 Flashcard Decks

Smoke Control and HVAC Systems Flashcards

7 cards from real F80 practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Smoke Control and HVAC Systems flashcards as text
  1. A fire alarm activates on the 10th floor of a high-rise with a smoke control system. Which action is typically automatic?

    Answer: Starting stair pressurization fans

    Stair pressurization fans usually start automatically on fire alarm to protect the exits.

  2. How should the fire alarm system monitor a smoke control fan's operation?

    Answer: By positive confirmation such as airflow or pressure proof

    Smoke control components require positive confirmation of operation, such as airflow switches, not just a command signal.

  3. While testing, the Certificate of Fitness holder finds a duct detector's remote test switch does not shut down the air handler. What should be done?

    Answer: Report the impairment and have the interlock repaired

    A failed HVAC shutdown interlock is a system impairment that must be reported and corrected.

  4. Smoke dampers in a smoke control system should report their position to the control panel for what reason?

    Answer: To confirm the damper actually reached its commanded open or closed state

    Position feedback verifies the damper responded properly during smoke control operation.

  5. An air handler is shut down for maintenance while its duct detector stays powered. What can happen?

    Answer: The detector may not sample properly because there is no airflow

    Duct detectors rely on airflow through the sampling tubes, so no airflow means unreliable sampling.

  6. What is the purpose of a smoke purge (smoke removal) system after a fire?

    Answer: To exhaust residual smoke and help the fire department clear the building

    Smoke purge mode helps firefighters remove smoke from affected areas after the fire is controlled.

  7. Before testing duct detectors that shut down HVAC in an occupied building, what should be done first?

    Answer: Notify building management and the monitoring station, since fans and dampers will operate

    Advance notice prevents false dispatches and surprises when HVAC equipment shuts down during the test.

How this page was made: written with AI tools. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. nyc-business.nyc.gov — Fees, renewal · verified Oct 2026
  2. nyc.gov — Test delivery, eligibility, exam format · verified Oct 2026