FDNY F-60 Certificate of Fitness — Fire Guard for Torch Operations — Questions and Answers
Question 1: A contractor is setting up for a torch operation. Who is responsible for completing and signing the hot work program authorization before work begins?
- The responsible person designated by the owner (Correct answer)
- The owner of the building
- The F-60 Fire Guard on duty
- The FDNY inspector
Correct answer: The responsible person designated by the owner
A hot work program authorization is not issued by the FDNY. It must be signed and issued by the 'responsible person' designated by the building or structure owner to oversee the hot work program.
Question 2: During torch operations, where must the fire guard be positioned?
- At the building's main fire alarm panel
- Outside the building monitoring exits
- In direct visual contact with the torch operator and work area (Correct answer)
- At the nearest fire extinguisher location
Correct answer: In direct visual contact with the torch operator and work area
The fire guard must maintain direct visual contact with the torch operator and work area at all times during operations.
Question 3: The 'Responsible Person' designated by the building owner plays a critical role in the hot work process. Which of the following is a primary record-keeping duty of the Responsible Person?
- Filing the citywide permit application with the FDNY on behalf of the contractor.
- Maintaining a log of all fire extinguishers used on the premises.
- Inspecting the hot work area and signing the Hot Work Program Authorization before work begins. (Correct answer)
- Issuing the F-60 Certificate of Fitness to the Fire Guard.
Correct answer: Inspecting the hot work area and signing the Hot Work Program Authorization before work begins.
The Responsible Person's key duty is to inspect the specific work area to ensure it is fire-safe and then to issue and sign the Hot Work Program Authorization. This document is the official record authorizing the specific hot work operation at that time and place.
Question 4: Which of the following is a required element in a fire watch log entry when torch operations are underway?
- The cost of materials being installed
- The names of all workers on the floor
- The model number of the torch being used
- The name and C of F number of the Fire Guard on duty (Correct answer)
Correct answer: The name and C of F number of the Fire Guard on duty
The Fire Guard's name and C of F number are required to identify the qualified individual responsible for the watch.
Question 5: Which type of gas is most commonly used in torch operations covered under the F60 certificate?
- Propane
- MAPP gas
- Acetylene (Correct answer)
- Natural gas
Correct answer: Acetylene
Acetylene is the most commonly used fuel gas in torch operations due to its high flame temperature.
Question 6: When fire is discovered during torch operations and the fire guard uses a portable extinguisher, the PASS technique stands for:
- Pull, Aim, Squeeze, Sweep (Correct answer)
- Prepare, Aim, Squeeze, Sweep
- Pull, Angle, Spread, Secure
- Press, Activate, Shoot, Scan
Correct answer: Pull, Aim, Squeeze, Sweep
PASS is the standard fire extinguisher technique: Pull the pin, Aim at the base of the fire, Squeeze the handle, and Sweep side to side.
Question 7: A fire guard observes that combustible materials cannot be moved away from the torch work area. What is the correct action?
- Cover the combustibles with fire-resistant shields before work begins (Correct answer)
- Wet down the combustible materials with water
- Proceed with operations and monitor closely
- Notify the torch operator to work faster to reduce exposure time
Correct answer: Cover the combustibles with fire-resistant shields before work begins
When combustible materials cannot be removed, they must be protected with fire-resistant shields or covered before torch operations begin.
Question 8: Which of the following is an acceptable method for a fire guard to contain a small torch-ignited fire while waiting for FDNY?
- Covering the fire with roofing felt to smother it
- Using a garden hose or portable extinguisher appropriate for the fire class (Correct answer)
- Leaving the fire unattended to retrieve water from a lower floor
- Pouring gasoline on the fire to create a controlled burn-out
Correct answer: Using a garden hose or portable extinguisher appropriate for the fire class
A garden hose or appropriate portable extinguisher can be used for initial attack on a small fire, but the fire guard must never leave the scene or use inappropriate materials.
Question 9: Which type of fire extinguisher is MOST appropriate for a fire guard to have readily available during torch operations on a bituminous roof?
- CO2 extinguisher only
- Class K extinguisher
- 2.5-gallon water extinguisher or dry chemical ABC extinguisher (Correct answer)
- Class D extinguisher
Correct answer: 2.5-gallon water extinguisher or dry chemical ABC extinguisher
A 2.5-gallon water extinguisher or dry chemical ABC extinguisher is suitable for the common combustibles encountered in roofing torch operations.
Question 10: After calling 911 for a fire emergency at a torch operation site, what critical information must the fire guard provide?
- The estimated cost of damage and number of workers on site
- The contractor's license number and insurance policy
- Exact location, nature of fire, and whether the building is occupied (Correct answer)
- The type of roofing material being installed
Correct answer: Exact location, nature of fire, and whether the building is occupied
Dispatchers need the exact address, fire description, and occupancy status to send appropriate resources and priority response.
Question 11: At a construction site, flammable gases used in torch operations must be stored how far from ignition sources when not in use?
- At least 10 feet
- At least 5 feet
- At least 50 feet
- At least 20 feet (Correct answer)
Correct answer: At least 20 feet
Flammable gas cylinders must be stored at least 20 feet from ignition sources or separated by a fire-resistant barrier.
Question 12: How long is the Fire Guard for Torch Operations certificate typically valid?
- 1 year
- 5 years
- 3 years (Correct answer)
- Indefinitely
Correct answer: 3 years
The Certificate of Fitness for Fire Guard for Torch Operations (F60) is typically valid for a period of three years. This standard validity period ensures that certificate holders periodically review their knowledge and compliance with current fire safety regulations. After three years, renewal procedures are required to maintain active certification.
Question 13: A 'Responsible Person' is designated at a hot work site to ensure safety. According to FDNY regulations, which of the following is a primary duty of the Responsible Person BEFORE issuing a hot work authorization?
- Notify the local firehouse of the planned work.
- Train the F-60 Fire Guard on torch operation techniques.
- Inspect the hot work site to ensure it is a fire-safe area. (Correct answer)
- Personally operate the fire extinguisher in a drill.
Correct answer: Inspect the hot work site to ensure it is a fire-safe area.
The FDNY code specifies that the Responsible Person must inspect the hot work area before authorizing any work to begin. This inspection is to ensure that all necessary precautions are in place and the area is free from fire hazards.
Question 14: Which protective device must remain on a compressed gas cylinder whenever the regulator is not attached?
- Flow control cap
- Dust cover seal
- Valve protection cap (Correct answer)
- Pressure relief valve
Correct answer: Valve protection cap
The valve protection cap guards the cylinder valve from physical damage during handling and transport and must always be in place when the regulator is removed.
Question 15: When using the PASS technique, what does the second 'S' stand for?
- Spray in circles
- Sweep side to side (Correct answer)
- Stop and reassess
- Start at the base
Correct answer: Sweep side to side
In the PASS technique, the second S stands for Sweep — move the extinguisher nozzle side to side at the base of the flames.
Question 16: How long must Hot Work Permit records be retained after the work is completed?
- 3 years
- 1 year (Correct answer)
- 6 months
- 30 days
Correct answer: 1 year
FDNY regulations require that Hot Work Permit records be retained for a minimum of one year after completion of the work.
Question 17: According to FDNY regulations, for how long must the Hot Work Program Authorization, signed by the Responsible Person, be kept available for inspection after the completion of hot work?
- 30 days
- 24 hours
- 7 days
- 48 hours (Correct answer)
Correct answer: 48 hours
The FDNY Fire Code stipulates that the Hot Work Program Authorization must be available for inspection by any representative of the Fire Department during the work and for a period of 48 hours after the work is complete.
Question 18: A Fire Guard is conducting a fire watch for a torch operation on a construction site. After the torch work is completed for the day, what is the MINIMUM amount of time the Fire Guard must continue to monitor the area?
- 15 minutes
- 30 minutes (Correct answer)
- 1 hour
- Until the supervisor dismisses them
Correct answer: 30 minutes
According to FDNY regulations and standard hot work safety procedures, the fire watch must continue for at least 30 minutes after the completion of torch operations to detect and extinguish any smoldering fires.
Question 19: What is the correct sequence for shutting down torch equipment at the end of a work period?
- Close only the oxygen cylinder valve, leaving fuel available for re-ignition
- Close cylinder valves first, bleed gas from lines through the torch, then close torch valves (Correct answer)
- Turn all valves off simultaneously to save time
- Close torch fuel valve, then torch oxygen valve, then cylinder valves
Correct answer: Close cylinder valves first, bleed gas from lines through the torch, then close torch valves
Closing cylinder valves first and bleeding lines through the torch ensures no pressurized gas remains trapped in hoses and regulators, preventing hose burnback.
Question 20: Under NYC Building Code, hot work permits on construction sites are typically valid for what maximum duration?
- One month
- One work shift (8 hours)
- One calendar day (Correct answer)
- One week
Correct answer: One calendar day
Hot work permits are typically valid for one calendar day and must be reissued for subsequent days of work.
Question 21: What is the minimum fire extinguisher rating required at a torch operation work site per FDNY regulations?
- 1-A
- 2-A:10-B:C (Correct answer)
- 4-A:60-B:C
- 10-A:20-B:C
Correct answer: 2-A:10-B:C
FDNY requires at least one 2-A:10-B:C rated extinguisher within 30 feet of any torch operation work site.
Question 22: Which type of fire extinguisher is most appropriate for a hot work area where torch operations involve flammable gases?
- Class D metal fire extinguisher
- Class K wet chemical extinguisher
- Class B dry chemical extinguisher (Correct answer)
- Class A water extinguisher
Correct answer: Class B dry chemical extinguisher
Class B extinguishers are rated for flammable gas and liquid fires, which are the primary hazard during torch operations.
Question 23: For a standard torch operation at a construction site, what is the MINIMUM rating for a portable fire extinguisher that must be readily accessible?
- 2-A:20-B:C (Correct answer)
- 1-A:10-B:C
- 3-A:40-B:C
- 10-B:C
Correct answer: 2-A:20-B:C
The FDNY requires at least one portable fire extinguisher with a minimum rating of 2-A:20-B:C to be readily accessible within 30 feet of where hot work is performed. A higher rating is required for specific operations like torch-applied roofing.
Question 24: During post-torch monitoring, a fire guard detects heat in a wall with an infrared thermometer. The reading is significantly above ambient temperature. What action is required?
- Open the wall with tools to visually confirm before calling anyone
- Record the reading and check again in one hour
- Treat it as a potential hidden fire and call 911 (Correct answer)
- Notify the roofing foreman and continue monitoring
Correct answer: Treat it as a potential hidden fire and call 911
An anomalous heat reading in a structural component after torch work indicates a potential concealed fire and must be treated as an emergency requiring 911.
Question 25: Under NYC regulations, torch operations on a roof must cease at what point relative to sunset?
- One hour before sunset (Correct answer)
- At sunset
- When natural lighting becomes insufficient for safe work
- 30 minutes before sunset
Correct answer: One hour before sunset
Torch operations on roofs must stop one hour before sunset to allow adequate fire watch during remaining daylight.
Question 26: When operating a portable fire extinguisher, the acronym P.A.S.S. is used to describe the proper technique. What does the 'A' in P.A.S.S. stand for?
- Aim at the base of the fire (Correct answer)
- Alert the supervisor
- Assess the situation
- Activate the alarm
Correct answer: Aim at the base of the fire
The P.A.S.S. method stands for Pull the pin, Aim at the base of the fire, Squeeze the handle, and Sweep from side to side. Aiming at the base is crucial for extinguishing the source of the fuel, rather than just the flames.
FDNY F-60 Certificate of Fitness — Fire Guard for Torch Operations
The FDNY F-60 Certificate of Fitness exam certifies fire guards to oversee torch operations involving open flames, cutting, welding, and soldering at construction sites and buildings in New York City.
Exam Rules
- You can skip questions and return to them later
- Flag questions for review before submitting
- No feedback shown until you submit the entire exam
- Unanswered questions count as wrong — answer everything
- 10 pretest questions are mixed in and don't affect your score
- Timer auto-submits when time runs out
- Your progress is auto-saved every 30 seconds
These practice questions were written with AI tools. They are not real exam questions. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- nyc-business.nyc.gov — Score release, score validity · verified Oct 2026
- nyc.gov — Test delivery, exam format, passing score, registration deadline, retake policy, time limit, eligibility, fees, renewal, test dates · verified Oct 2026