EPA Cheat Sheet 2026

The 30 highest-yield EPA facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

25 questions
60 min time limit
70% to pass
  1. Lead renovation waste (paint chips, used sheeting, disposable PPE) is classified under federal regulations as: → Household hazardous waste, typically exempt from RCRA hazardous waste regulations
  2. States with EPA-authorized RRP programs may have requirements that are: → As stringent as or more stringent than the federal EPA RRP Rule
  3. Child-occupied facilities covered by the RRP Rule include which of the following? → Day care centers built before 1978
  4. What must be done if visible dust remains after cleanup? → Re-clean using HEPA vacuuming and wet wiping
  5. What is the minimum polyethylene sheeting thickness required for interior containment under the EPA RRP Rule? → 6-mil polyethylene sheeting
  6. What action should be taken if an area fails cleaning verification? → Re-clean and re-verify the area
  7. What documentation is required when a renovator determines a surface does NOT contain lead based on test results? → A report describing the test results and the surfaces tested
  8. Why is cleaning verification important after lead renovation? → To confirm the area is safe and free of lead dust
  9. A contractor generates lead paint chips and dust during a renovation. Who is responsible for proper waste disposal? → The renovation firm performing the work
  10. When must contractors renew their RRP certifications? → Every five years
  11. When must cleaning verification be performed? → Immediately after cleaning
  12. Why is recordkeeping critical for EPA compliance? → To demonstrate compliance with EPA rules
  13. What is the role of signage in risk reduction? → To warn and inform about hazards
  14. Why should workers never eat, drink, or smoke inside a lead renovation work area? → Ingestion of lead dust is a primary route of lead exposure
  15. A test kit is used on a painted surface and produces an inconclusive result. Under the RRP Rule, this surface must be treated as: → Containing lead-based paint
  16. Which type of training is mandatory for renovators under the RRP Rule? → EPA-accredited lead-safe work practices course
  17. What is the correct way to clean up after lead-safe renovation work? → HEPA vacuum followed by wet wiping
  18. Which year is the key cutoff for target housing under the EPA RRP Rule? → 1978
  19. What is the purpose of pre-renovation education documentation? → To confirm occupants were informed about lead hazards
  20. What is the correct way to remove disposable coveralls to minimize lead dust exposure? → Roll them inward (inside-out) from the shoulders downward
  21. Which regulation governs lead-safe renovation work? → Renovation, Repair and Painting (RRP) Rule
  22. Which of the following actions is prohibited during interior lead renovation containment setup? → Using fans to create positive air pressure that pushes air out of the work area
  23. Which statement about the RRP Rule's applicability to zero-bedroom (studio) dwellings is CORRECT? → Studio apartments built before 1978 are covered by the RRP Rule
  24. Under the RRP Rule, renovation activities on pre-1978 housing may proceed without lead-safe practices only if: → A certified renovator has determined through testing that no lead-based paint is present
  25. In owner-occupied target housing, when must the renovator provide the 'Renovate Right' pamphlet to the owner? → Before the renovation begins
  26. What is a key factor for successfully reducing risks on-site? → Teamwide safety responsibility and culture
  27. Which projects are exempt from the RRP Rule? → Projects disturbing very small amounts of lead paint
  28. Which groups are considered most vulnerable to the health effects of lead exposure? → Children under 6 years old and pregnant women
  29. When must the work area be available for re-occupancy by residents following lead renovation? → Only after cleaning verification has been successfully completed
  30. Why is hazard recognition important in renovation work? → To prevent accidents and health risks