Strategic Planning & Implementation Flashcards
7 cards from real EPA 608 practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Strategic Planning & Implementation flashcards as text
A facility with 100 lb of R-22 in a commercial refrigeration system finds a 25% annual leak rate. What threshold applies for required repairs?
Answer: 20%
Commercial refrigeration appliances with 50 or more pounds must be repaired when the leak rate exceeds 20%.
Within how many days must leaks be repaired once the leak rate threshold is exceeded for an appliance subject to leak repair?
Answer: 30 days
Owners generally must repair the leaks within 30 days of discovery.
What is the leak rate trigger for industrial process refrigeration?
Answer: 30%
Industrial process refrigeration has a 30% leak rate trigger.
What is the leak rate trigger for comfort cooling appliances with 50 or more pounds of ODS refrigerant?
Answer: 10%
Comfort cooling appliances are subject to repair at a leak rate above 10%.
After repairs, what must be done to confirm a leak has been fixed?
Answer: Perform initial and follow-up verification tests
Initial and follow-up verification tests must confirm the repairs worked.
How long must owners keep records of leak inspections and refrigerant additions?
Answer: 3 years
Records of service, leak inspections, and refrigerant added must be kept for 3 years.
An owner can seek an extension on leak repair if what condition exists?
Answer: Parts or industry shutdown prevents timely repair
Extensions apply for situations like needing parts or required industrial shutdowns, as documented.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy