Safety Regulations and Compliance Flashcards

7 cards from real ENV SP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Safety Regulations and Compliance flashcards as text
  1. The Toxics Release Inventory (TRI) program under EPCRA Section 313 requires certain facilities to annually report releases of toxic chemicals to:

    Answer: EPA and the state, with data publicly accessible

    TRI reports are submitted to EPA and state agencies and are made publicly available in EPA's TRI database to support community right-to-know.

  2. Which Envision credit addresses the safety and reliability of energy supply for infrastructure operations?

    Answer: RL1.3 – Prepare for Long-Term Adaptability

    RL1.3 evaluates how well a project is designed to adapt to long-term changes including energy supply reliability and climate shifts that affect operations.

  3. Under the Endangered Species Act (ESA), what is a 'Section 7 consultation' and when is it required?

    Answer: A formal or informal process where federal agencies consult with FWS or NMFS to ensure projects do not jeopardize listed species

    ESA Section 7 requires federal agencies to consult with the US Fish and Wildlife Service or NOAA Fisheries to ensure their actions are not likely to jeopardize listed species or destroy critical habitat.

  4. What is the primary purpose of a Stormwater Pollution Prevention Plan (SWPPP) on a construction site?

    Answer: Identify sources of stormwater pollution and describe best management practices to minimize discharge of pollutants

    A SWPPP is required under the NPDES Construction General Permit and documents BMPs to prevent pollutants such as sediment, chemicals, and debris from entering stormwater runoff.

  5. A project team applies for Envision certification and discovers the design does not address a known seismic hazard zone. Under which Envision credit would this gap most likely be cited?

    Answer: RL2.1 – Assess Climate Threat to Infrastructure

    RL2.1 requires projects to assess threats from natural hazards including seismic events and design infrastructure to withstand or adapt to those threats.

  6. Which DOT regulation governs the transportation of hazardous materials by highway and requires proper placarding, packaging, and shipping papers?

    Answer: 49 CFR Parts 100–185 – Hazardous Materials Regulations (HMR)

    DOT's Hazardous Materials Regulations (49 CFR 100–185) govern the transportation of hazardous materials including classification, packaging, marking, labeling, placarding, and shipping papers.

  7. In life-cycle safety analysis for an Envision project, which phase is often overlooked but carries significant safety risks from hazardous material exposure and structural instability?

    Answer: End-of-life decommissioning and demolition phase

    Decommissioning and demolition often expose workers to asbestos, lead paint, and structural hazards, making end-of-life safety planning a critical but frequently neglected lifecycle stage.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. sustainableinfrastructure.org — Test delivery, eligibility, retake policy, score validity, exam format, passing score, retake fee, score release, time limit, fees · verified Oct 2026