← All E2 Flashcard Decks

Plan Review and Inspections Flashcards

21 cards from real E2 practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 20 Plan Review and Inspections flashcards as text
  1. During a plan review for a commercial building, the inspector notices that the electrical drawings lack a fault current calculation. What should the inspector require before approving the plans?

    Answer: Require the engineer to provide available fault current calculations and equipment interrupting ratings

    NEC 110.9 and 110.10 require that equipment have adequate interrupting ratings and be protected against fault currents, which must be verified during plan review.

  2. A commercial plan set shows a 480V, 3-phase panel with a 400A main breaker but the service conductors are sized for only 350A. What is the correct inspector action?

    Answer: Reject the plans and require conductors sized to at least 400A or a smaller main breaker

    NEC 230.90 requires the service overcurrent device to not exceed the ampacity of the service conductors it protects.

  3. When reviewing plans for a commercial occupancy, which document is most important for verifying that proposed wiring methods are suitable for the environment?

    Answer: The specification section listing approved wiring methods and environmental conditions

    Specification sections detail approved wiring methods, environmental conditions, and material standards that the inspector uses to verify NEC compliance.

  4. A plan review reveals that a mechanical room will house a 480V motor control center (MCC). The plans do not show working space clearances. What should the inspector do?

    Answer: Reject the plans and require dimensioned working space drawings per NEC 110.26

    NEC 110.26 requires specific working space clearances that must be shown on plans so the inspector can verify compliance before construction begins.

  5. During an inspection of a commercial building under construction, an inspector finds conduit installed in a concrete slab that is not listed for concrete encasement. What is the correct action?

    Answer: Issue a correction notice and require removal and replacement with listed concrete-encased conduit

    NEC 358.10 and related articles require that wiring methods be listed and suitable for the conditions of use, including concrete encasement.

  6. A commercial electrical plan shows twelve 20A, 120V circuits in an office area. The inspector calculates the load exceeds the panel's available capacity. What action should be taken?

    Answer: Reject the plans and require an amended load calculation and panel schedule showing adequate capacity

    NEC 220 requires load calculations to confirm panel capacity before approval; the engineer must revise plans to show compliant capacity.

  7. When inspecting a commercial service entrance, the inspector observes that the service conductors pass through a basement ceiling space without conduit protection for approximately 8 feet. Which NEC requirement addresses this?

    Answer: NEC 230.50, which requires service entrance conductors to be protected where subject to physical damage

    NEC 230.50 requires service entrance conductors to be protected against physical damage, typically requiring conduit in accessible areas such as basement spaces.

  8. During a plan review, an inspector sees that the one-line diagram shows a 2000A service with a single 2000A disconnect. The building also has an emergency generator. Which NEC section governs the number and grouping of service disconnects?

    Answer: NEC 230.71, which limits service disconnecting means to a maximum of six disconnects

    NEC 230.71 permits a maximum of six disconnects for a service, and all disconnects must be grouped together.

  9. An inspector is reviewing plans for a restaurant kitchen and notices that the equipment grounding conductors for all circuits are shown as the same size. What potential issue should be investigated?

    Answer: NEC 250.122 requires EGCs to be sized based on the rating of the overcurrent device protecting each circuit

    NEC 250.122 requires equipment grounding conductors to be sized based on the ampere rating of the overcurrent protective device in the circuit, so larger circuits need larger EGCs.

  10. A commercial plan review shows a 208Y/120V panelboard feeding a dedicated computer room. The plans indicate that isolated ground receptacles will be installed. What must the inspector verify on the plans?

    Answer: That the isolated ground circuit includes an insulated equipment grounding conductor run back to the panel, and the panel enclosure is still grounded

    NEC 250.146(D) requires isolated ground receptacles to include an insulated EGC back to the source, while the panel enclosure must remain grounded.

  11. While reviewing commercial plans, an inspector finds that a rooftop HVAC unit disconnect is shown mounted on the rooftop adjacent to the unit. The unit is fed by a 460V feeder. Which requirement is most critical to verify?

    Answer: That the disconnect is located within sight of the unit and is readily accessible per NEC 430.102

    NEC 430.102(B) requires a disconnect within sight of motor-driven equipment, and NEC 430.107 requires it to be readily accessible.

  12. During a rough-in inspection of a commercial building, the inspector observes that flexible conduit (FMC) is used for the final connection to a rooftop air handler. The run is 10 feet long. What NEC requirement applies?

    Answer: FMC over 6 feet requires a bonding jumper per NEC 250.118 since it may not provide an adequate ground path

    FMC longer than 6 feet may not provide an adequate ground path, so NEC 250.118 requires a bonding jumper in parallel with FMC exceeding this limit.

  13. A commercial plan review reveals that all branch circuit conductors are shown as 12 AWG copper. Some circuits have 30A breakers for dedicated equipment. What code issue does this present?

    Answer: 12 AWG copper is only rated for 20A overcurrent protection per NEC 240.4(D), so 30A breakers are not permitted

    NEC 240.4(D) limits 12 AWG copper to a maximum 20A overcurrent device; 30A breakers on 12 AWG violate this requirement.

  14. An inspector reviewing plans for a commercial office building sees that receptacle circuits in an open office area are not shown with AFCI protection. The building is a new 2023 NEC project. What should the inspector require?

    Answer: The inspector should verify the applicable edition of the NEC adopted locally, as AFCI requirements for commercial have expanded in recent editions

    AFCI requirements have expanded with each NEC edition, and applicability in commercial spaces depends on the locally adopted code edition; the inspector must verify the adopted edition.

  15. A commercial electrical inspection reveals that conductors in a cable tray are not secured at the ends of the tray and at each section connector. Which NEC article applies to cable tray wiring support requirements?

    Answer: NEC Article 392, which governs cable tray systems including support and installation requirements

    NEC Article 392 governs cable tray installation, including requirements for securing cables at the ends and transitions.

  16. During a plan review for a new commercial building, the engineer's load calculations show a demand factor applied to the lighting load. Under what NEC section is a demand factor permitted for commercial lighting?

    Answer: NEC 220.42, which permits demand factors for lighting loads in specific occupancy types based on Table 220.42

    NEC 220.42 and Table 220.42 permit demand factors for lighting loads in commercial occupancies such as stores, hospitals, and hotels.

  17. An inspector is performing a final inspection on a commercial kitchen. The plans show a 6-foot metal countertop that is not bonded to the electrical system. What should the inspector require?

    Answer: Verify whether the countertop is within 6 feet of a sink and if so, require bonding per NEC 250.104 or applicable plumbing/equipment bonding requirements

    In commercial kitchens, metal surfaces near plumbing or electrical equipment may require bonding to prevent shock hazards per NEC 250.104 and related sections.

  18. A plan review for a commercial parking garage shows lighting circuits without GFCI protection. Under which condition does the NEC require GFCI for lighting in a commercial parking structure?

    Answer: GFCI protection is only required for receptacles in parking garages, not lighting circuits

    NEC 210.8(B) requires GFCI protection for receptacles in commercial garages, but lighting circuits are governed by different requirements; the inspector should verify applicability.

  19. During a service inspection, the inspector finds that the neutral conductor at the service entrance is connected to the grounding electrode system and also bonded to the equipment grounding bus in a downstream distribution panel. What is wrong with this installation?

    Answer: This creates a parallel neutral path (objectionable current) and violates NEC 250.6; the neutral-ground bond must only occur at the service equipment

    NEC 250.6 prohibits objectionable current on grounding conductors; the neutral-to-ground bond must occur only at the service disconnect, not at downstream panels.

  20. An inspector reviewing plans for a commercial data center notices that the UPS bypass panel is not shown with a clear identification label on the drawings. What should the inspector require?

    Answer: Require the plans to show labeling requirements for all emergency and bypass equipment per NEC 700.9 and 705.10

    NEC 700.9 and 705.10 require that emergency and standby equipment be clearly identified on plans and in the field so inspectors and first responders can locate disconnects.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. iccsafe.org — Retake policy, renewal, score validity, score release, eligibility, passing score, exam format · verified Nov 2026
  2. shop.iccsafe.org — Fees, test dates · verified Nov 2026