During a heavy-lift operation, the cargo is considered to be transferred to the ship's crane when:
-
A
The slings are attached to the cargo
-
B
The cargo leaves the dock surface
-
C
The hook takes the weight (cargo becomes weightless on the dock)
-
D
The cargo crosses the ship's rail