During DP operations, a sudden loss of one power bus in a DP-2 vessel should result in:
-
A
Total loss of DP capability
-
B
A safe reduction in available thrust but continued DP operation on the remaining bus
-
C
Immediate manual takeover only
-
D
Activation of the anchor system